Following is a list of devices that have been verified via each Evaluation pathway and subsequently received a Verification Certificate from Stormwater Australia. Verification Reports and Date of Verification are provided for each device.
Body of Evidence Pathway Verifications
(SQIDEP Version 1.3)
Product | Details | Verification Certificate | Verification Report | Verification Date |
---|---|---|---|---|
SPELBasin | Website Link | ![]() |
![]() |
25 Sep 2020 |
SPEL Hydrochannel | Website Link | ![]() |
![]() |
22 Jun 2021 |
SPELFilter Full Size System | Website Link | ![]() |
![]() |
23 Dec 2022 |
Detailed Performance Report (Field Evaluation Pathway) Verifications
(SQIDEP Version 1.3)
Product | Details | Verification Certificate | Verification Report | Verification Date |
---|---|---|---|---|
TBA | TBA | TBA | ||